Editable PowerPoint templates

Pie PowerPoint templates
Where is the planting backlog concentrated?

Move crews between districts before the planting window closes. Open “Street tree planting” to edit the example, or choose from 24 templates.

Use my own data
  • Free to start
  • No add-in, Mac & Windows
  • Native editable .pptx
Interactive Native .pptx Template16:9 · OOXML Native Vector .pptx

Street tree planting

Share of outstanding work · Trees planted · Move crews between districts before the planting window closes.

Sample Dataset Included

East
9
Old town
39
Riverside
40
Sample charts · 24

What you can build with it

These editable charts use illustrative data. Pick the one closest to your story, open a copy and swap in your own numbers — the chart and its annotations update as you type, and any theme is one click away.

  • Library holds

    Data you need: Period × category, in holds filled

    Set aside shelf space for the branches handling the most holds.

    • Latest volume mix
  • Reusable cup returns

    Data you need: Period × category, in cups collected

    Check whether station drop boxes picked up returns after the café moved.

    • Share of absolute change
  • Archive digitization

    Data you need: Actual and target by category (Scanned pages)

    Schedule the scanning team around the collections still short of their digitization quotas.

    • Share of outstanding work
  • Island ferry boardings

    Data you need: Period × category, in boardings

    Reserve extra sailings where weekend and holiday traffic concentrates.

    • Mix at peak demand · Day 5
  • Repair bench throughput

    Data you need: Period × category, in devices repaired

    Decide how many benches to reserve for each device family.

    • Latest volume mix
  • Station ticketing channels

    Data you need: Period × category, in tickets issued

    Adjust counter coverage as passengers move to kiosks and mobile tickets.

    • Share of absolute change
  • Building lighting retrofit

    Data you need: Actual and target by category (Fixtures replaced)

    Send installers to buildings with the largest remaining fixture counts.

    • Share of outstanding work
  • School lunch preparation

    Data you need: Period × category, in meals served

    Use the ordering cycle to plan prep space for hot meals and packed lunches.

    • Mix at peak demand · Day 3
  • Linen service loads

    Data you need: Period × category, in kilograms washed

    Allocate wash cycles to hotel, dining and event linen independently.

    • Latest volume mix
  • Invoice settlement channels

    Data you need: Period × category, in invoices settled

    Plan reconciliation work as bank transfers give way to automatic collection.

    • Share of absolute change
  • Street tree planting

    Data you need: Actual and target by category (Trees planted)

    Move crews between districts before the planting window closes.

    • Share of outstanding work
  • Museum admissions

    Data you need: Period × category, in admissions

    Shift guides between exhibition halls as school visits peak.

    • Mix at peak demand · Day 3
  • Materials recovery

    Data you need: Period × category, in tonnes sorted

    Allocate baler time to the material streams moving through the sorting center.

    • Latest volume mix
  • Apprentice training formats

    Data you need: Period × category, in learner-hours

    Size workshop sessions as demonstration hours move into supervised practice.

    • Share of absolute change
  • Housing inspection rounds

    Data you need: Actual and target by category (Visits completed)

    Prioritize districts whose completed visits fall below their service commitments.

    • Share of outstanding work
  • Flower auction lots

    Data you need: Period × category, in lots sold

    Plan auction slots by variety before the holiday ordering peak.

    • Mix at peak demand · Week 4
  • Print shop jobs

    Data you need: Period × category, in finished jobs

    Assign press time by the mix of finished jobs, including small specialist runs.

    • Latest volume mix
  • Campus charging sessions

    Data you need: Period × category, in charging sessions

    Check whether the new garage is absorbing sessions from the visitor lot.

    • Share of absolute change
  • Textbook dispatch

    Data you need: Actual and target by category (Boxes shipped)

    Dispatch the next truck to the school cluster furthest from its shipment target.

    • Share of outstanding work
  • Arena gate admissions

    Data you need: Period × category, in tickets scanned

    Move stewards before the late rush at individual gates.

    • Mix at peak demand · Slot 4
  • Food bank deliveries

    Data you need: Period × category, in boxes delivered

    Reserve van space for the partners taking the largest deliveries.

    • Latest volume mix
  • Audiobook borrowing

    Data you need: Period × category, in loans

    Decide when to expand streaming access as disc borrowing declines.

    • Share of absolute change
  • Trail resurfacing

    Data you need: Actual and target by category (Metres finished)

    Assign surfacing crews to trails still behind their handover targets.

    • Share of outstanding work
  • Costume hire calendar

    Data you need: Period × category, in costumes hired

    Reserve fitting appointments around school shows and theatre openings.

    • Mix at peak demand · Month 4
  • Not seeing your case?Paste your table and NoteSlide suggests the right chart, annotations included.Paste my data

How to read the example

Slice sizes show each district’s share of the outstanding planting commitment.

Inputs for the featured case

Actual and target by category (Trees planted)

Other uses for this chart

Library holds · Reusable cup returns · Island ferry boardings

When to use it

  • Move crews between districts before the planting window closes.
  • Set aside shelf space for the branches handling the most holds.
  • Check whether station drop boxes picked up returns after the café moved.

What to watch for

  • The slices must form one total. Overlapping district assignments need to be deduplicated.

Build a pie slide

Paste a table or import a spreadsheet; the chart, its labels and the CAGR arrow are built for you.

  1. Choose a use case

    Open “Street tree planting” or filter the gallery to find a closer example.

  2. Replace the sample inputs

    For the featured example, prepare: Actual and target by category (Trees planted).

  3. Review and export

    Check labels against your source, then export the slide to PowerPoint.

Edit on the chart

Drag a bar and the number changes with it

If a number is off, drag the bar or nudge it with the arrow keys; the data sheet follows. Select any part of the chart for a contextual toolbar with colors, labels and arrows.

  • Drag bars or use arrow keys to change values
  • Edit values in place, the data sheet stays in sync
  • Hand edits survive when you change chart settings
Native PPTX

You export a deck you can edit, not a screenshot

Every bar, label and arrow in the downloaded .pptx is a native PowerPoint shape, so colleagues can change text and colors without any plugin. Import it back into NoteSlide and it is still a chart.

  • Opens in PowerPoint, Keynote and WPS
  • Runs in the browser on Mac and Windows
  • Re-import into NoteSlide and keep editing it as a chart

Frequently Asked Questions

How do I read the pie example?+

Slice sizes show each district’s share of the outstanding planting commitment.

Which inputs does the featured case use?+

Actual and target by category (Trees planted)

What should I check before drawing a conclusion?+

The slices must form one total. Overlapping district assignments need to be deduplicated.

Can I edit one of the other examples?+

Choose a case in the gallery and select “Make one like this” to open its own editable slide.

Ready to export your native editable .pptx?

Paste your Excel table or customize this template directly in your browser — zero desktop add-in required.

Use my own data

Related chart templates